Breaking News

Lagos Plans Reconstruction of Ladipo Market Road

Written by 
Published in Labour
Monday, 06 July 2015 00:00

Lagos State Government Sunday indicated plans to reconstruct the popular Ladipo Auto Spare Parts Market road and other connecting roads to enhance vehicular movement within the axis.

This came to fore when government officials inspected some road networks in the Papa Ajao and Ladipo Spare Parts Market areas in Mushin and Oshodi/ Isolo Local Government Areas of the State with a commitment to commence rehabilitation that would make the roads motorable.

Permanent Secretary in the state Ministry of Works and Infrastructure, Mr. Bamgbose-Martins who led the inspection said plans are underway to get the contractor working on the Daleko Road back on site to finish the remaining portions of the road.

"We need to get the contractor back on site, have them fill it up at least so that it becomes motorable", he said.

Martins, who was joined by the General Manager, Lagos State Public Works Corporation, Ayotunde Sodeinde, the Chief Press Secretary to the state governor, Habib Aruna and other officials of the Ministry of Works and Infrastructure, said palliative measures would be applied by the Public Works Corporation on other roads and craters in the Papa Ajao area.

On the state of Ladipo Market Road, he ruled out the option of carrying out palliative work saying that what the road needs is total reconstruction.

"One of the things you would observe here is that the road here is gone, in terms of standard road, it's gone. It's not a case for palliative; it's not a case for patching. This is a case where the road has to be totally reconstructed.

"In other words, we need to redesign it to fit into the habits and the use that is here. It's a market. There are rocks here, so it is still motorable, even if it rains, it is motorable. So PWC can't come here and put asphalt because it's not going to last. If they put asphalt, the next rain, it will wash off", he said.

He however said the State will list the road in its plan of work for next year as some other roads in the State need urgent attention.

"It is still passable now, but what we need here is a full construction."

"When we are going to do anything, we are going to redesign it and then we have to reconstruct from the beginning, that's the situation here, but for now, at least it's motorable".

"If we allow Public Works Corporation (PWC) come in here, we would just come and waste resources, but we'll redesign it. We'll probably take the option of using concrete pavement, we call it reinforced concrete, rigid pavement and the reason why we consider that is because there's a market here and what it means is that heavy vehicles will come here, you're going to have tankers, trailers come in here with heavy axle loading".

"Some of them would even park here. Any road here that we don't put in a lasting solution will fail. So this would be one of the things we would begin to look at next year, it's not going to be an immediate thing, but between now and then we'll do the design of the road. Even the soil effect is affected, we'll have to rip it off and do it all over again".

He cautioned the traders in Ladipo Market area against parking containers and articulated vehicles on the roads, saying the roads are not designed for such heavy stationery load.

"The roads are not designed for trailers to park on them. This is what we saw when we went to Apapa. You have trailers parking on the Bridges permanently and that's what you call static loading, it's not designed for that. The bridge won't collapse, but overtime, there'll be fatigue. The same thing that can happen to the bridge, can also happen to the roads," he said.

 

Source: This Day

Read 1329 times
Editor

Online Editor at Interarchtiv Media Company

Sponsored Links

LAGOS ARCHITECTS FORUM 2015: THE BUSINESS OF ARCHITECTURE
REGISTER NOW
Wed. 6th – Sat. 9th May 2015, at the Jasmine and Zinnia Halls, Expo Centre of the Eko Hotel & Suites, Victoria Island, Lagos.
Original VRay Software
www.verticaimages.com
Buy your original VRay software in Nigeria now and get special benefits

Mailing List

Contact us

No. 5 Olusesi Street,Behind Tyse Oil Filling station by Chevron Toll Gate, Lagos.

Tel: +234 [0] 1 293 1819

Tel: +234 [0] 809 357 7122

Tel: +234 [0] 805 341 8334

Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

Twitter: @interarchtiv

Facebook: Interarchtiv

LinkedIn: Interarchtiv Media

Pintrest: Interarchtiv

Google+: Interarchtiv

Website: http://www.interarchtiv.com

Facebook



Connect with Us

About Us

Interarchtiv is a Media House with a Focus on Architecture, the built Environment, Innovative solutions to complex urban problems in our society and environmental issues. We are interested in how architecture & the environment influences the lives of people & how people in turn interact with the former. We believe our environment shapens our perspective, efficiency, creativity & general well being. 

We are an aggregation of People, Places & Events in one space with a goal of making Architecture Social

JoomShaper